    The Long Baseline Neutrino Facility (LBNF) project hosted at Fermilab is building the world’s highest power neutrino beamline for the Deep Underground Neutrino Experiment (DUNE). The new beamline will utilize 120 GeV protons with a time-averaged beam power of 1.2 MW (upgradeable to 2.4 MW) from the Fermilab Main Injector on a graphite target installed within the bore of a magnetic focusing...

    Go to contribution page
  2. Quinn Peterson (Fermilab)
    09/11/2023, 13:45
    Contributed Oral

    The Long Baseline Neutrino Facility (LBNF) Project, currently under final design, will deliver neutrino beam to the Deep Underground Neutrino Experiment (DUNE) utilizing 120 GeV proton beam on a graphite target at 1.2 MW in 2031 and up to 2.4 MW by 2036. The LBNF neutrino beamline utilizes several beam intercepting devices that are being designed and built to withstand the cyclic thermal shock...